FEB list

From BESIII Ferrara Group Wiki
Revision as of 04:02, 1 October 2019 by F.Cossio (talk | contribs) (Layer 1)
Jump to: navigation, search

Here the status of all FEBs is reported.

Layer 1[edit | edit source]

HW_FEB Status Chip 1 Chip 2 Notes
1 Torino 1 2 da Marco, rinominata in 61
2 IHEP: ready for nL1 1 2
3 back to Torino 1 2
4 Torino 1 2 da Marco
5 IHEP: ready for nL1 1 2
6 back to Torino 1 2 missing calibration files
7 Torino 1 2
8 IHEP: ready for nL1 1 2
9 IHEP: ready for nL1? 1 2 Tx align when tilted?
10 IHEP: ready for nL1 1 2 old TB calibration
11 installed on oL1 1 2
12 Torino 1 2
13 IHEP: ready for nL1 1 2
14 installed on oL1 1 2
15 1 2 missing
16 IHEP: ready for nL1 1 2
17 installed on oL1 1 2
18 back to Torino 1 2
19 back to Torino 1 2 old TB calibration
20 installed on oL1 1 2 old TB calibration
21 IHEP: ready for nL1 1 2
22 IHEP: ready for nL1 1 2
23 back to Torino 1 2
24 back to Torino 1 2
25 IHEP: ready for nL1 1 2
26 IHEP: ready for nL1 1 2
27 IHEP: ready for nL1 1 2
28 Torino 1 2
29 IHEP: ready for nL1 1 2
30 IHEP: ready for nL1 1 2
31 Torino 1 2
32 Torino 1 2
33 Torino 1 2
34 Torino 1 2
35 Torino 1 2
** 1 2 missing from old production?
New production starting from FEB 26 (10 FEBs --> FEB26-35)

Layer 2[edit | edit source]

HW_FEB Status Chip 1 Chip 2 Notes
1 installed on L2 1 2 old TB calibration
2 installed on L2 1 2 old TB calibration
3 installed on L2 1 2
4 installed on L2 1 2
5 Torino 1 2 spare? already calibrated
6 installed on L2 1 2
7 installed on L2 1 2
8 Torino 1 2 spare? already calibrated
9 installed on L2 1 2
10 AEMME 1 2
11 removed from L2 (Sep 2019) 1 2 high noise and dead channels
12 installed on L2 1 2
13 Torino 1 2
14 Torino 1 2
15 Torino 1 2 spare? already calibrated
16 Torino 1 2
17 installed on L2 1 2
18 installed on L2 1 2
19 installed on L2 1 2
20 installed on L2 1 2
21 installed on L2 1 2
22 Torino 1 2
23 Torino 1 2
24 installed on L2 1 2
25 installed on L2 1 2
26 installed on L2 1 2
27 installed on L2 1 2
28 1 2 missing
29 removed from L2 (Sep 2019) 1 2 missing TP on chip 1
30 installed on L2 1 2
31 Torino 1 2
32 installed on L2 1 2
33 installed on L2 1 2
34 installed on L2 1 2
35 Torino 1 2
36 installed on L2 1 2
37 installed on L2 1 2
38 installed on L2 1 2
39 Torino 1 2
49 Torino 1 2 spare? to be calibrated
50 installed on L2 (Sep 2019) 1 2
51 Torino 1 2
52 installed on L2 1 2
53 IHEP: spare for L2 1 2
54 Torino 1 2
55 IHEP: spare for L2 1 2
56 installed on L2 (Sep 2019) 1 2
57 installed on L2 (Sep 2019) 1 2
58 Torino 1 2 spare? to be tested

Layer 3[edit | edit source]