Difference between revisions of "Integration week - June 17 2019"

From BESIII Ferrara Group Wiki
Jump to: navigation, search
(Created page with "The week will be held in IHEP lab and clean room from Jun 17 to Jun 22. The goal is to increase the status of the setup, in preparation for the arrival of the new L1. Main i...")
 
Line 10: Line 10:
 
* Continue documentation preparation
 
* Continue documentation preparation
 
* Check of the new performance of fast clock distribution hardware
 
* Check of the new performance of fast clock distribution hardware
* Firmware fix for present bugs: time packet information, spurious hit.
+
* Firmware fix for present bugs: time packet information, spurious hit
 +
* Make everybody aware of the analysis process and clarify the variables meaning
 +
Verify strange time bump:
 +
* Acquire without TP
 +
* Acquire  with low gain on GEM

Revision as of 04:42, 11 June 2019

The week will be held in IHEP lab and clean room from Jun 17 to Jun 22.

The goal is to increase the status of the setup, in preparation for the arrival of the new L1.

Main ideas:

  • Check mapping of L1 and L2: hardware and software. Also by means of radioactive source
  • Study of the reproducibility of the results: different short data taking during the day
  • Study of the effect of the current variation on the noise and charge performance.
  • Continue documentation preparation
  • Check of the new performance of fast clock distribution hardware
  • Firmware fix for present bugs: time packet information, spurious hit
  • Make everybody aware of the analysis process and clarify the variables meaning

Verify strange time bump:

  • Acquire without TP
  • Acquire with low gain on GEM