Difference between revisions of "L1 FEB20 Chip1"

From BESIII Ferrara Group Wiki
Jump to: navigation, search
m (Dead channels)
m
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Status: '''CURRENTLY INSTALLED'''
+
Status: '''left on oL1 for the Experimental Hall Test in September 2019'''
 +
 
 +
Position on oL1:
  
 
* GEMROC: 0
 
* GEMROC: 0
Line 21: Line 23:
 
== Channels summary ==
 
== Channels summary ==
  
MISSING S&H CALIBRATION FILE
+
OLD TB S&H CALIBRATION FILE

Latest revision as of 16:07, 28 November 2019

Status: left on oL1 for the Experimental Hall Test in September 2019

Position on oL1:

  • GEMROC: 0
  • TIGER: 2
  • HW_FEB: 20
  • SW FEB: 1
  • BESIII ID: 2
  • STRIP-X: 143-162
  • STRIP-V: 692-735


Calibration files[edit | edit source]

Comments[edit | edit source]

Dead channels[edit | edit source]

  • ch. 34

Channels summary[edit | edit source]

OLD TB S&H CALIBRATION FILE